So, we
have a reference of character... |
|
(10th October) Result of the first day
of work.
(11th October) Our success on the
second day.
(12th October) The third day.
(13th October) Fourth day.
(14th October) Fifth day.
(15th, 16th October, weekend) The
sixth and seventh days.
(17th, 18th October) We had time to
sew the bottom feeypaws.
(23th October) So. Today we have on 23
October.
(25th October ) Head, noce,
feetpaws and flip-flops.
(31th October ) Ventilation
for head. "Boxes" of eyes. Sleeves for partrial. Exoskeleton.
(3rd November).
Pasting
head by furs. The inner part of the head...
(7th
November). Shock absorbers
jumpsuit. The head was glued for furs.
(9th November). Fursuit for Lux Fox was fully ready.
(10th November). Change the color of
the apron. Page by photoshoot and description in development.
|
|
|
|
|
|
|
|
|
|
So looks a
scan for the our head. Increase it to LCD monitor and redraw it on the
paper: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Next, cut out this blank of sheet material, in this
case - is insulation for pipes.
It is possible to take into account the natural curves of the material,
so that later they were reflected in the right places on the blank for
head.
|
|
|
|
|
|
|
|
|
|
After gluing the entire top of the head, at the
edge of the workpiece is necessary to glue the wire (we use steel wire
for welding). |
|
At this stage, necessary to form the loop for
fixing the jaw (it will be shown later). |
|
|
|
UP... |
|
|
|
|
|
|
|
UP... |
|
|
|
|
|
|
|
|
Our success on the second day (11th
October):
framework of wire glued to the inside of the
head,
made jaw,
almost sew by overloc the gray part of the overalls,
cut and sewn white, central part of overalls,
cut blanks for handpaws.
|
|
|
|
This is the
framework of wire glued to the inside of the head bases. Also, there
appeared a jaw (her mount - temporary).
|
UP... |
|
|
|
|
|
|
|
|
The third
day (12th
October).
We produce stitching by overlock for overalls and handpaws.
Handpaws already have the pads and claws.
The
head get ears. Head was undergone revision total form - the result of
the changes was laid out now in the beginning of the page (corrected
scanning for this form).
|
|
|
UP... |
|
|
|
UP... |
|
|
|
UP... |
|
|
|
|
|
|
|
|
Fourth day (13th
October)
Was made skeleton-frame for the eye.
We continue sew gloves and overalls for fursuit.
|
|
|
UP... |
|
|
|
|
|
|
|
Fifth day (14th
October).
The trip for get the materials: fleece black, pink, Velcro, camping mat
for the soles of sandals and cloth tapes for them.
The final sewn handpaws. Within handpaws were sewing gum, to
beautifully abide by hand shape.
Will be cut the parts for feetpaws.
Bonding the strips from fleece for decorative and strengthening head -
was launched this stage.
|
|
|
UP... |
|
|
|
|
|
|
|
|
The sixth and seventh days
(weekend, 15th, 16th October)
Presale preparation of two our fursuits and a little help for our
friends.
At the same time will continue overlock stitching jumpsuit
and feetpaws for this project.
|
|
|
|
|
|
|
|
|
|
17th,
18th October
We continues the pre-sale run-up for Toony
Fox fursuit.
|
October 18 we had
time to sew the bottom feeypaws:
|
UP... |
|
|
|
|
|
|
|
|
So. Today we have on 23 October.
During the period from October 18, we had to make a great pre-training
for the project "Toony Fox" and send it to the buyer. We managed to do
a photo shoot for "Silver Corgi" project, put the description on the
our site, and at auction. And we was done all it! Also we made a shell
for feetpaws (foam rubber base also ready), and sew the tail-cover.
|
|
|
UP... |
|
|
|
|
|
|
|
|
25th
October
Head was almost covering of inside by fleece.
Was formed nose (will come unstuck fleece).
Finished assembly feetpaws and flip-flops.
|
|
|
|
UP... |
|
|
|
|
|
|
|
|
31th
October.
Head completely papered inside by fleece.
Installed removable ventilation.
Prepared the eyes.
We was changing the color of the muzzle head for a high-quality fur on
the muzzle. Prepared scans for fur of head
Get stitched sleeves for option "partrial".
Was made lining of removable exoskeleton and attachment for them.
|
|
|
|
|
|
|
UP... |
|
|
|
|
|
|
|
|
3rd
of November.
"Jumpsuit" (body) was fully over.
We continue to do the head:
after the
installation of the eye was completed inner coating by fleece,
removable linings in the head was made,
currently we continues glue a furs to head.
|
|
|
|
|
UP... |
|
|
|
|
|
|
|
|
7
November.
In the suit, on the sides were sewn additional shock absorbers to
cushion the load on stitches and keep good fursuгter processing by a
his shape. The head was papered by fur. Continued production of tooth,
language, hairstyle and aprons - not much left...
|
|
|
|
UP... |
|
|
|
|
|
|
|
|
9
November.
Were made aprons for head.
Currently fursuit fully prepared.
|
|
|
UP... |
|
|
|
|
|
|
|
|
10-th
November.
Change the color of the apron.
A page with a description and photosession - in development.
|
|